$1.7M 27m diameter
thickener retrofit to washery
for BAYSWATER
COLLIERY CO. (Design
and Construction Project)

$1.0M Coal Preparation
Plant Feed and Secondary Circuit Upgrade to increase C.H.P.P. thoughput by
25%
BAYSWATER
COLLIERY CO. (Design
and Construction Project)
Key Benefits
- Re-used mechanicals, tanks and some structurals to minimise overall costs
- Modular design constructed around operating washery for minimal outage
impact
- Process design achieved better than required output on first commissioning
|