Bayswater Colliery Washery Fine Coal

Home Up Contact Us Contents Search Links

Projects Services

 

BCCThickenerAndWasheryArrgt.jpg (75872 bytes) BCCThickenerTunnelConstruction.jpg (80435 bytes) BCCThickenerOperationalArrgt.jpg (70809 bytes) BCCThickenerOperationalArrgtWasherySide.jpg (87628 bytes) BCCThickenerFeedTankArrgt.jpg (83752 bytes)

$1.7M 27m diameter thickener retrofit to washery
for BAYSWATER  COLLIERY  CO. (Design and Construction Project)

BCCFineCoalScreensArrgtElevation.jpg (85443 bytes) BCCFineCoalScreensArrgtPlan.jpg (87441 bytes) BCCWasheryFeedConveyors.jpg (66331 bytes) BCCFineCoalScreensDrives.jpg (71458 bytes) BCCFinesCircuitHeaderTankAndCyclones.jpg (77023 bytes) BCCFinesCircuit2Cyclones.jpg (66571 bytes)

$1.0M Coal Preparation Plant Feed and Secondary Circuit Upgrade to increase C.H.P.P. thoughput by 25%
BAYSWATER  COLLIERY  CO. (Design and Construction Project)

Key Benefits

  • Re-used mechanicals, tanks and some structurals to minimise overall costs
  • Modular design constructed around operating washery for minimal outage impact
  • Process design achieved better than required output on first commissioning

 


Note: Click on images for more info / to enlarge