Bulga Rejects System

Home Up Contact Us Contents Search Links

Projects Services

 

BulgaRejectsBinSystemExitSide.jpg (65497 bytes) BulgaRejectsBinSystemEntrySide.jpg (77960 bytes) BulgaRejectsBin1EntryArrgt.jpg (59627 bytes)  BulgaRejectsBinConstn4HeadHouse.jpg (67305 bytes)  BulgaRejectsBinConstn3ConeFit.jpg (74331 bytes) BulgaRejectsBinConstn1RingBeam.jpg (73305 bytes) BulgaRejectsBinConstn2ConeUpperTransport.jpg (39467 bytes) BulgaRejectsBin2Outlet.jpg (79146 bytes) 

$2.1M Rejects handling and auto truck loading facility

for BULGA  COAL (Design and Construction Project)

Key Benefits

  • Optimised mass flow with maximum capacity. 
  • Automated Euclid truck optimised fast filling system. Extremely reliable operation.
  • Compact functional economical system installed with minimum disruption to existing system.

 


Note: Click on images for more info / to enlarge