Please note that projects listed on this page are older or more minor in nature.

Rix's Creek Design & Construct 120,000t Stockpile Tunnel Reclaim and Rail Loading System

-    120m long reclaim tunnel with escape tunnel

-    420m long 3,500 tph 1500mm wide reclaim conveyor with elevated gantries feeding an 1,800 tonne rail loading bin.

-    Four 2,000 tph flow control feed gates to feed the reclaim conveyor from the stockpile

-    Design only of the 1,800 tonne rail Loading Bin and Foundations

 

Vickery Mine 100,000t Stockpile Reclaim System
-    100m long reclaim tunnel with escape tunnel and chamber

-    250m long 4,000 tph 1600mm wide reclaim conveyor with elevated gantries feeding an 1,000 tonne rail loading bin.

-    Two Malco 4,000 tph stockpile dischargers with flow control gates

 

Thiess Contractors Upper Hunter Operations - Facility Management Contract
Thiess operated a major workshop facility in the upper Hunter Valley providing Fabrication, Maintenance and Construction capabilities to the Coal Mining industry in the Hunter Valley. We were awarded the Management contract for the facility to provide full Project, Construction and General Management services to Thiess for all their construction works in the mining industry in the Hunter Valley.

During our two year contract for these services to the facility we were successful in securing major projects in a number of mines in the Hunter Valley and turned the facility from an operation which had suffered a number of years of negative results to one which showed strong positive returns for the duration of our contract, and providing Thiess with a saleable asset.

 

Kenmare Mine Underground & Surface Conveyor Maintenance Contract

Calsun's principals implemented and operated a full conveyor maintenance management system for Kenmare Mine in the Bowen basin, Qld. This produced significant gains for the mine from the performance based services provision contract entered into. A 24 hour operational crew of typically 30 personnel were engaged to provide maintenance and capital upgrade conveyor system services as the mine development process and longwall installation occurred. This contract was regarded as highly successful by all parties, but was terminated after 2 years due to a somewhat adversarial acquisition of the mine by a neighbour.

 

Minor Projects and Maintenance Work

In addition to the above projects, many minor projects and investigations have been conducted across multiple mine sites ranging from provision of better access to conveying and washery capacity upgrades and major repairs. We have also been requested to provide shutdown planning, construction management, and auditing / review / overview functions for projects / maintenance activities undertaken directly by our clients.

MCPSkirtlessChute.jpg (59169 bytes) MCPChuteTransition.jpg (77761 bytes)

Typical small chutework sections. Note simple spoon configuration which has been very successful in eliminating skirting in many applications, initially implemented in various locations around Macquarie Coal Preparation plant, Teralba.  